User Solutions, Inc.

Click on logos to view a sample of our customers’ success stories. You too can realize great success by working with US! Contact US today to discover how easy and affordable it is to plan, schedule, and track more efficiently than you ever thought possible.

From the birth of the first BURNER All Terrain Bikes (ATB) in 1992, to the 5 different 2000 models, Turner has strove to make the suspension frame as simple, rigid, and low maintenance as possible.

Read More

Arnold Quesenberry, Senior Consultant for A.G. Raymond & Co. Inc. has been using Resource Manager in conjunction with consulting projects. “We have found these spreadsheet add-ons are a perfect complement to traditional MRP and Shop Control systems.

Read More

GEMS Healthcare Solutions a wholly-owned subsidiary of GE Medical Systems headquartered in San Ramon, California, provides integrated data mining, Internet-based benchmarking and consulting solutions to healthcare providers who seek new strategies to reduce costs and improve quality of health care services.

Read More

We were looking for away to schedule three in-line departments and various machines. Scheduling was being completed by the respective department supervisors with no commonality between them. My major concern was being able to preprogram alternate routings for certain part numbers to achieve the outmost in flexibility throughout all departments.

Read More

GE Railcar Services Corporation, a unit of General Electric Corporation manages a fleet of over 180,000 railcars throughout North America and has successfully deployed Workcenter SchedulerXL. According to Mr. Dan Barich, Manager of Process Engineering, “In an effort to meet and exceed the expectations of our customers, we have purchased and installed the Workcenter SchedulerXL computer software system for all of our major repair shops located throughout U.S.”

Read More

Technical Glass Products in Snoqualmie, WA started out reviewing the Resource Manager for Excel product line but quickly settled on Resource Manager-DB for multi user support, advanced production scheduling options, and easy integration with corporate ERP systems. As Technical Glass was implementing a corporate wide upgrade to Microsoft SQL Server and Windows Server, they found many advantages in upgrading to Resource Manager-DB for SQL.

Read More

The USS Nimitz is one of the Navy’s nuclear powered aircraft carriers classified as a super carrier and the lead ship of its class. With a displacement of 100K+ tons, a length of 1K+ feet, a 4 acre deck, a crew 5K strong and only two locations in the world that can handle its dry dock maintenance needs, it needs to schedule two years out.

Read More

User Solutions has announced another successful manufacturing scheduling application for Plastilite. Plastilite Corporation, located in Omaha Nebraska, provides insulated and protective packing solutions to companies shipping perishable and fragile products across the United States. Their containers are now routinely used in transporting everything from Omaha Steaks to pies to vaccines and even biological materials, and the list of uses keeps growing.

Read More

I feel thankful. For cause, I am dubious when dealing with enterprises and guarantees by long distance; more so when considering the promises made by others for software solutions, sight unseen. My experience with User Solutions, Inc. has set a higher standard for my internet business dealings and software vendor expertise. Your premier product is in support and service. Your software reflects this.

Read More

The big problem we had was knowing exactly which raw material was needed to be purchased (qty & date) based on BOM, minimum quantity to order and basic costing. The biggest benefit with using Resource Manager-DB is the increased efficiency in purchasing department.

Read More

We have been using the RMDB scheduling software, increasingly, for the last year. I say increasingly because there was a lot of reluctance to using it first. The reluctance came because there was the idea that even though plywood production is “Old Technology” manufacturing, the intricacies of the different species and manners to deconstruct a log into various sizes of veneer and the reassemble it into plywood was too difficult to schedule.

Read More

For awhile, we had been seeking better scheduling information out of our system. Exact Software recommended Resource Manager-DB from User Solutions. We found that not only was the product quick to integrate with our Macola system, it also integrated easily with our current custom labor tracking system and provides the needed visibility for us to plan labor more accurately.

Read More

In March 2005, BAE Systems / Ordnance Systems Inc. set out to design and implement a process that would enable our manufacturing personnel to systematically identify process, equipment, labor, and material limitations when responding to customer order delivery inquiries. We had purchased and implemented an ERP system (with Material Requirements Planning and Capacity Requirements Planning functionality) in 2002, but we weren’t satisfied with its ability to recognize our capacity constraints or meet our finite scheduling needs.

Read More

Our situation is that we are a relatively small organization (AUD$50M of sales) and we have an outdated MRP system. The current system in Australia has no effective scheduling ability and is very cumbersome to use for product costings. We are also in the process of starting up a new facility in China, which has no MRP system at all, and the people there have little modern manufacturing experience.

Read More

Instruments For Industry, Inc (IFI), is a leader in the design and manufacture of Solid State and Traveling Wave Tube Amplifiers (both pulsed and CW). IFI equipment is used successfully in applications all over the world and is the leading supplier of high power transmitters.

Read More

uxicached