|
 |

| Products:
Workcell
Planner Overview |
Overview
The objective of the model is to provide the master
scheduler or planning function with a tool for
determining the overall level of capacity and
distribution of capacity required to meet demand. This
demand can be driven by a forecasted incoming rate or
consuming a backlog within a specified time frame for a
particular cell - as well as for overall plant level.
More specifically, the model:
- Translates a
forecast or backlog into machine and manpower
requirements for each resource in a cell and
compares this with the capacity given the current
man machine configuration.
- Allows easy what if
analysis of the interaction of setup time, lot size,
efficiency, operation yield, and work practices such
as working bottlenecks through breaks. Allows
analysis of flow with multiple setups per part vs.
batch and the payoff on throughput of set up
reduction results.
- Clearly shows the
bottleneck resource that limits cell output
dynamically as factors are changed.
- Shows what can be
expected from the existing man-machine configuration
and can be used to set expected cell output rates,
shift schedules and manning levels and easy
configuration.
Features
- Capacity balancing
- Resource
optimization
- Runs with Excel
- What-Ifs
- Production Planning
- Built in graphing
- Integrates with any
system
- Source code included
Pricing and Ordering
$79 single user - 2x price for five user
Multi-user systems available
30 day money back guarantee
Operates concurrently with Microsoft Excel.
Credit Cards, COD, and Purchase Orders accepted
For more information, or to order email: sales@usersol.com
or contact the address below.
|



|
|
Home
| Products
| Order
| About US |
Demos | FAQ
Success Stories
| Press Releases
| Partners 11009
Tillson Drive, South Lyon, MI, 48178 phone: (248)
486-1934 fax: (248) 486-6376 All
content copyright © 2001, User Solutions, Inc. All rights reserved.
Content reproduction prohibited by law. Site
designed by Rich
Ensley for
User Solutions, Inc. |