| |
| Resource
Manager for Excel |
|
|
|
|
 |
| SUMMARY |
|
|
|
 |
Resource
Manager is an affordable and flexible planning and
scheduling solution that works for all manufacturing
enterprises. There are two versions available, depending
on your needs:
Resource
Manager for Excel (RM-X)
RM-X is an add-on to Excel (version 97 and greater)
and is designed for single concurrent users who are
familiar with Excel. A fully functional trial is available
for immediate download.
Resource
Manager DB (RM-DB),
An elegant upgrade, written in Visual Basic, utilizes
a runtime version of Microsoft Access Database or
is also availble with SQL Server compatibility. Resource
Manager DB contains the functionality of RM-X, plus
many more enhancements. Resource Manager DB features
a special version of RM-X for a report output option.
For a more in depth look at RMDB, click
here.
These
combined offerings provide you unsurpassed flexibility
for leveraging Excel on local PCs, and sharing data
across a network. Finally, you can achieve your goals
of an affordable planning and scheduling solution
that quickly adapts to your needs.
|
 |
| FEATURES |
|
|
|
 |
 |
Finite
Planning & Scheduling |
 |
Costing
and Estimating |
 |
MRP
and Inventory Management |
 |
Integrates
with ALL systems |
 |
Routings
and Priority Scheduling
|
 |
Ideal
for Lean Manufacturing |
 |
Easy
"what-if" analysis |
 |
Run
stand alone or networked |
 |
Purchasing
and Receiving |
 |
Production
Planning |
 |
Forecasting |
 |
Concurrent,
intuitive scheduling of material, workcenters and
labor requirements |
|
|
|
|